Implementation of construction drawings

  • Implement construction drawings for excavation and foundation concrete pouring.

  • Implement drawings for ground improvement construction.

  • Implement drawings for pile construction.

  • Implement shop detail drawings.

These drawings are meticulously completed with high accuracy and are utilized in construction projects in Japan. With years of experience in the field, coupled with the application of BIM to enhance product quality, we are confident in meeting the most demanding requirements of one of the world’s toughest markets like Japan

Process of implementing construction drawings

1
Receive design documents (design drawings, BIM models) from the Structural Design Department
2
Link to exchange information with Takeuchi Construction departments
3
Apply BIM to create accurate construction drawings in a short time
4
Update changes from the Structural Design Department and make quick edits

Receive design documents (design drawings, BIM models) from the Structural Design Department

Obtain project design materials, such as architectural drawings, structural drawings, and BIM models, from the Structural Design Department. Then, analyze and consolidate the relevant information and documents required for the project. Execute construction drawings. The number of required construction drawings will vary for each distinct project and activity, depending on the specific needs. Nevertheless, the projects all have the same characteristic of implementing construction using Takeuchi Group’s proprietary TNF method.

Link to exchange information with Takeuchi Construction departments

Efficient and precise execution of building designs necessitates the crucial step of establishing communication and information exchange with the relevant departments at Takeuchi Construction. There are three primary departments that require communication and information sharing, as outlined below:

  • Design Department: Require verification of the authenticity of the architectural, structural drawings, or BIM models recently received. Prompt and precise communication is necessary for any modifications that occur during the design phase.
  • Laboratory Department: Confirm information related to the experimental results (cement mixing ratio), things that need attention that were realized during the experiment.
  • Construction Department: Require a discussion on construction techniques and construction management in order to modify construction drawing plans to be more suited and efficient for the construction process. Furthermore, it is important to ascertain the anticipated completion date of the design, identify any modifications that will be made throughout the building phase, etc., and subsequently, allocate people properly and expeditiously finalize the drawing in accordance with the specified specifications.

Apply BIM to create accurate construction drawings in a short time

Takeuchi Group, including VINA TAKEUCHI Co., Ltd., is utilizing the BIM model and TNF technology tools to quickly and accurately create construction drawings. This is made possible by the continuous development and application of advanced technologies. This system offers a high level of precision, making it simple to oversee and verify information. The use of a youthful workforce, adeptness in operating Revit software, and implementation of Addin TNF Bundles and BIM system have greatly diminished the duration required for generating construction drawings.

Update changes from the Structural Design Department and make quick edits

Teams engage in collaborative efforts on the BIM model, facilitating the seamless incorporation of design modifications from various departments into the overall project. This ensures that any changes made by the Structural Design Department can be easily updated and adjusted across the model. BIM also aids in risk management, providing control over each stage and substantially minimizing implementation failures.